RAISED FLOOR INSTALLATION RANKING

 

Raised ground application  areas to be examined will be held in the first place. The cleanliness of areas for applications, concrete floor, should not be the screed residue.
Installation  things to field measurements (with 60cm x 60cm panel because it is in standard measurements) and fire should be taken account to be made.
Fire account while calculating Considerations 60cm x 60cm raised floor panel having the size in the size not exceeding 30cm due to wall dimensions while the two pieces are removed from the first panel, 30cm availability depends on the scale remaining in the measurement should be evaluated and minimum wastage resulting calculation considering panel and foot pieces must be removed.
Created the grid and then pulled the rope joints in order to start the assembly to form the central axis in accordance with the specified dimensions. In accordance joint rope, it begins to be raised from the center of the elevated floor panel joints by controlling the interior panel and each panel to be placed in a corner foot by bringing the raised floor scales are provided.

Other work in the field to be applied can not exceed the values raised flooring panels in the installation temporary interruption or negotiated way communication it is to be worked, due to the fact that the module of the raised floor system system 4 hand, should not be exceeded until sıkıştırılmayınca.

Raised  applicable regardless of the floor in the foot and the panel, i.e. before fixing foot point of each panel can not be obtained. Parallel to advance and adhered by placing each foot on the edge of the raised floor panels of the other panel placed at the landing process is performed.
So that the area has been closed, except middle side wall edges.
Side wall parts are placed on the jig or deeper cut with a cutter along the walls of the panels, again with respect to the angle on the side near the edges. The wall have to be panels with plastic gasket or an alias plastic star on the last panel of the apparatus used to prevent the movement four jets 2 of mutually nail in the leg head opposing cut, otherwise would have come on the raised floor panels with nails and can not be terminated embodiment, the present the elevation.

The raised floor system by placing the edges of the compressed parts will show action against the movement from the system. The residue sticking to the floor and the elevated floor to be done up until intentional breakage of the gelmeyince blow drying time of the adhesive is not possible. 24 hours. in areas that the user must not exceed the raised floor is required during this time showing the necessary sensitivity. 

Contact the seller
Raised Floor Application and Installation
Raised Floor Application and Installation
for
by the goods
Your message must contain at least 20 symbols. The message must not be more than 2000 symbols.
Obligatory field is not filled
The field is wrongly filled
The field is wrongly filled
Compare0
ClearSelected items: 0