Currency EUR
The equipment for production of bricks with utilization of the evils of ablation of thermal power plan – Titan Machinery, OOO | all.biz
Buy The equipment for production of bricks with utilization of the evils of ablation of thermal power plan
The equipment for production of bricks with utilization of the evils of ablation of thermal power plan

The equipment for production of bricks with utilization of the evils of ablation of thermal power plan

Products from producer
In stock
Price:
921505.76 EUR
Shipping:
Seller
Ukraine, Kharkov
(View map)
+380 
Display phones
Technical characteristics
  • Country of manufactureChina
Description
The equipment for production of bricks from ashes of nose of thermal power plant and combined heat and power plant allows to solve environmental problems of the power generation companies and to get additional profit not only on economy on operation of the economy of ash dumps, but also on sale demanded in the market of material - brick. Video presentation of work of the line: https://www.youtube.com/watch?v=2cWOXyh8rko the Presentation of one of projects here - https://www.youtube.com/watch?v=a7rYNuguXFg our company delivers equipment sets, is engaged in installation, commissioning and service of the equipment. We are physically located in the People's Republic of China and we have two plants certified on ISO 9001 there. The line for production of bricks (zoloshlakovy bricks) allows to receive products which cost value is extremely low because of the following factors: economy on raw materials, cheap energy and decrease in costs of ecological collecting and operation of ash dumps.

Our company has complex decisions for decrease in emissions of thermal power plant (combined heat and power plant) in the atmosphere by implementation of desulfirizator and use of active lime from filters for its use as the brick knitting for production.

Contact the seller
The equipment for production of bricks with utilization of the evils of ablation of thermal power plan
The equipment for production of bricks with utilization of the evils of ablation of thermal power plan
Shipping method
Compare0
ClearSelected items: 0