Currency EUR
The electrodrill for kickoff of a lateral trunk – Omskoe specialnoe konstruktorskoe byuro priborov, OAO | all.biz
Buy The electrodrill for kickoff of a lateral trunk
The electrodrill for kickoff of a lateral trunk

The electrodrill for kickoff of a lateral trunk

Products from producer
In stock
Reconfirm the price with seller
Shipping:
Seller
Russia, Omsk
(View map)
+7(3 
Display phones
Description
Purpose of EZBS

EZBS (fig. 1; a photo 3, 4) it is intended for creation of the hydraulic channel (microadit) between an oil (gas) well and productive layer by drilling of an opening (perforation) with a diameter of 20 mm and up to 0,85 m long in an upsetting column and bottomhole space.

EZBS can be used on wells with an internal diameter of upsetting column of 130 and 150 mm and walls up to 12 mm thick.

Advantages of use of EZBS

EZBS, unlike cumulative perforation, provides opening of oil layer without deformation of an upsetting column and violation of integrity of a cement insulating layer behind an upsetting column.

EZBS provides oil from a well with the minimum percent of content of water in it.

After layer opening by the electrodrill EZBS there is no need for so-called "raskhazhivaniye" of a well for ensuring more effective oil recovery.

EZBS, unlike cumulative and hydraulic perforation, allows to open, including low-power productive layers with thickness from 0,4 m of ground waters in close proximity, excluding, at the same time, flood of oil layer.

After opening of EZBS layer from two to six times the debit of a well increases.


Work of EZBS

After lowering of the EZBS borehole device on a point of perforation its fixing in a well by means of a gear emphasis is made.

Then come a drill exit from the case of the conductor and drilling of an upsetting column at a small speed of giving of a spindle.

Further drilling of bottomhole space at a bigger speed of giving of a spindle is provided by accumulation of length of a boring column with the boring tubes leaving a kassetnik (fig. 1).

Upon termination of drilling a gear emphasis is involved and, thereby, for ensuring rise the borehole device rasfiksirutsya.

Time of drilling of one opening - within 45 minutes.

Examples of charts of drilling of lateral trunks 0,4 and 0,85 m long are given in a photo 1, 2.

Photo 1. Photo 2. Technical characteristics of the electrodrill for kickoff of lateral trunk in productive oil (gas) layer (EZBS)

Characteristics of the electrodrill

Parameters

The supply voltage is three-phase, In

380 (+38;-57)

Power consumption with a rated voltage of food of 380 V, W, no more:

2200

Resource of work of the electrodrill, hour, not less

300

Time of kickoff of a lateral trunk, min., no more

45

Quantity of microadits for one descent, piece.

1

Depth of kickoff of a lateral trunk, m

0,4-0,85

Diameter of a microadit, mm, not less

20

Area of a filtration of one microadit, sq.m

0,025-0,056

Microadit deviation from the chosen direction in the plane, perpendicular to an axis of a well, m, no more

0,2

Hydrostatic pressure, MPa, no more

80

Temperature in a well, °C, no more

90

Maximum overall dimensions of the electrodrill: borehole part

- diameter, mm

- length, mm

land control panel, mm

116

3500 440x480x475

Mass of the electrodrill: borehole part, kg, no more

land part, kg, no more

105

55

Service life, years, not less

2

Photo 3. Photo 4.
Contact the seller
The electrodrill for kickoff of a lateral trunk
The electrodrill for kickoff of a lateral trunk
Shipping method
Compare0
ClearSelected items: 0