The electrodrill for kickoff of a lateral trunk
- Customer pickup,
- Courier
- In detail
(View map)
EZBS (fig. 1; a photo 3, 4) it is intended for creation of the hydraulic channel (microadit) between an oil (gas) well and productive layer by drilling of an opening (perforation) with a diameter of 20 mm and up to 0,85 m long in an upsetting column and bottomhole space.
EZBS can be used on wells with an internal diameter of upsetting column of 130 and 150 mm and walls up to 12 mm thick.
Advantages of use of EZBSEZBS, unlike cumulative perforation, provides opening of oil layer without deformation of an upsetting column and violation of integrity of a cement insulating layer behind an upsetting column.
EZBS provides oil from a well with the minimum percent of content of water in it.
After layer opening by the electrodrill EZBS there is no need for so-called "raskhazhivaniye" of a well for ensuring more effective oil recovery.
EZBS, unlike cumulative and hydraulic perforation, allows to open, including low-power productive layers with thickness from 0,4 m of ground waters in close proximity, excluding, at the same time, flood of oil layer.
After opening of EZBS layer from two to six times the debit of a well increases.
Work of EZBS
After lowering of the EZBS borehole device on a point of perforation its fixing in a well by means of a gear emphasis is made.
Then come a drill exit from the case of the conductor and drilling of an upsetting column at a small speed of giving of a spindle.
Further drilling of bottomhole space at a bigger speed of giving of a spindle is provided by accumulation of length of a boring column with the boring tubes leaving a kassetnik (fig. 1).
Upon termination of drilling a gear emphasis is involved and, thereby, for ensuring rise the borehole device rasfiksirutsya.
Time of drilling of one opening - within 45 minutes.
Examples of charts of drilling of lateral trunks 0,4 and 0,85 m long are given in a photo 1, 2.
Photo 1. Photo 2. Technical characteristics of the electrodrill for kickoff of lateral trunk in productive oil (gas) layer (EZBS)
Characteristics of the electrodrill |
Parameters |
The supply voltage is three-phase, In |
380 (+38;-57) |
Power consumption with a rated voltage of food of 380 V, W, no more: |
2200 |
Resource of work of the electrodrill, hour, not less |
300 |
Time of kickoff of a lateral trunk, min., no more |
45 |
Quantity of microadits for one descent, piece. |
1 |
Depth of kickoff of a lateral trunk, m |
0,4-0,85 |
Diameter of a microadit, mm, not less |
20 |
Area of a filtration of one microadit, sq.m |
0,025-0,056 |
Microadit deviation from the chosen direction in the plane, perpendicular to an axis of a well, m, no more |
0,2 |
Hydrostatic pressure, MPa, no more |
80 |
Temperature in a well, °C, no more |
90 |
Maximum overall dimensions of the electrodrill: borehole part
- diameter, mm - length, mm land control panel, mm |
116 3500 440x480x475 |
Mass of the electrodrill: borehole part, kg, no more
land part, kg, no more |
105 55 |
Service life, years, not less |
2 |
Photo 3. | Photo 4. |