Description

Description

The strut bulk developing is intended for the top filling liquid in tanker trucks with ensuring filling a product under a layer. The bulk strut is executed in the form of developing pivotally - jointed pipelines. Application of hinged connection of the pipeline, allows to form a continuous electric chain throughout the hinged pipeline.

-

The design of a bulk tip is carried out with application of a telescopic pipe which in the put situation reduces dimensions, provides convenience of service on a manipulation with a strut when moving to garage or working situation, and also transition from one compartment to another.

-

Strut of the top filling oil products in tanker trucks without function of the account, without automation of ASN - 4B Du100 (0 - 0 (1)) U2 with a possibility of the manual termination of filling, complete with the manual valve splitter, complete with basic racks for fastening to a metal construction (1 - existence of the manual valve of the splitter).

-

Attention: For providing requirements of modern standards of the equipment (the PB 09 - 560 - 03 items 2.4.9) this type of struts needs to be retrofitted the sensor of level of limit filling, the valve the splitter of double action and the control unit

-

Tekhnichesky solutions of ASN:

1. The beginning of filling by a nalivshchik at manual opening of the valve of the splitter on a strut -
2. The filling termination by a nalivshchik at manual closing of the valve of the splitter -
3. A possibility of manual adjustment of an expense (the valve has the splitter several fixed provisions of opening) -
4. A possibility of installation on a bulk tip of two sensors of level -
5. A possibility of giving of a signal from the limit sensor on the executive device -
6. The sensor of level is fixed in a clip with a possibility of adjustment of height of level of filling -
7. Replacement of the condensing cuffs is made without dismantling of hinges -
8. Withdrawal of PVS from a filling zone when filling the tank (at the order with a sleeve of removal of vapors) -
9. The bulk telescopic tip is equipped with the self - braking winch for an omitting and raising of a telescopic pipe -
10. The mechanism of fixing of a tip provides tightness of pressing of a tight cover to a tanker truck mouth.
11. The cover of a tip fastens on a bulk pipe by means of a rubber cuff for an additional deviation from the horizontal plane -
12. Filling one product through one hundred - YAK -
13. The design of a strut ensures safety, reliability and convenience of operation during all service life.

-

Environmental friendliness:

Tightness of joining of ASN with a tanker truck is provided with use of covers of compartments of a tanker truck with the unified sizes of a jellied mouth and the condensing cover of a bulk tip. The bulk tip with a jellied mouth of a cover of a tanker truck is docked by turn of two levers and provides absolute tightness in comparison with conical consolidation at which about 50% of the forced - out steam - air mix are released into the atmosphere. Bulk struts are equipped by figurative kaplesbornik. Withdrawal of PVS from a filling zone when filling a tanker truck through a special sleeve "on a candle" or to installation to installation of recovery of vapors is provided. Sleeves of removal of vapors are equipped with the fire prevention device and the backpressure valve.

-

Reliability:

Reliable controlled giving of a product. Tightness of hinged connections. Protection against corrosion and safety of appearance is reached by application of the following methods: zinc covering in the hot way, bead - blasting processing and covering two - component enamel.

-

Technical characteristics:

  • Diameter of conditional pass of a strut - 100 mm
  • Zone of service of a strut of the top filling - ±2,9 m - with a height and/c 2500 mm
  • Ambient temperature - - from - 40 to + 50 °C for C. isp. U2
  • Seismicity - C0
  • Working pressure - 0,5 MPAS (5 kgfs/cm2)
  • Diameter of a mouth and/c - 300 mm
  • Height served and/c - from 2500 to 3900 mm
  • Diameter of a copper of the served tanker trucks - from 1200 to 2200 mm
  • Bulk tip of the top filling - Telescopic for the closed or open filling with the sensor of level and the FEET button
  • Material of the hinged pipeline - Steel 3 for isp. U2
  • Material of a metal construction and basic racks, ladder, ladder - Steel 3 for isp. U2
  • Material of hinges - Steel 45
  • Material of consolidations of hinged connections - Ftorplast - a cuff, Pentasil - sealing rings, Maslobenzostoyky rubber - a boot
  • Material of a flowing part of a bulk tip - Aluminium Amg5 alloy
  • Tip cover material - Aluminium Amg5 alloy
  • Material of a sleeve of removal of vapors - Steel 20 – on direct sites, the Hinge (steel) on hinged joints
  • Diameter of a sleeve of removal of vapors - 70 mm
  • Balancing of a strut, ladder - the Spring balance weight
  • ASN service life - 8 years
  • The mass of a complex - 500 kg

$ ("table") . contents () . find ("a") of . attr ("rel") = "nofollow"

var google_tag_params = { ecomm_prodid: '1150', ecomm_pagetype: 'product', ecomm_totalvalue: } -

&nbsp
Contact the seller
The ASN installation - 4B
The ASN installation - 4B
Shipping method
Payment method
Compare0
ClearSelected items: 0