SECOND-HAND Biogas cogeneration station RG8915
- Customer pickup,
- Courier
- In detail
0.8 MW SECOND-HAND Biogas cogeneration station. Installation is developed for work on dumps. At station the received biogas is burned and 800 kW of electrical energy are developed. Year of release 2011, till today in work, at the moment the operating time makes 11000 hours. The station turns on the following capital equipment:
- System of extraction of biogas, power 500m3/hour (there is an opportunity to increase this power to 1000m3/hour, for this purpose it is necessary to install one more compressor).
- System with vertical and snake holes.
- System of remote monitoring of process.
- System of high-temperature combustion of biogas. Combustion temperature of biogas is from 1000-1200 0C.
- 2 pieces of the gas-driven generator, each 400 kW, MWM TCG 2016 V08 C model.
