Radio control by the crane
- Customer pickup,
- Courier
- In detail
- Country of manufactureUkraine
The control of the bridge and gantry crane is, as a rule, made from a cabin - specially trained worker - crane operator.
Transfer of the crane to radio control allows:
- to remove the crane from registration (the cranes to 10 t inclusive transferred to management from a floor are not subject to registration);
- to lower financial costs of service of the crane;
- to reduce the number of service personnel;
- to increase safety of work, to exercise control of the crane out of a dangerous zone of works, on sufficient big removal from freight.
- to increase labor productivity, due to decrease in idle times of workers, reduction of operations;
- to precisely control movement, positioning of the transported freight. Considerably visibility of an installation site of freight increases that is especially important during the work with the valuable, fragile moved equipment and freights.
Use of systems of radio control by the crane gives the chance of simultaneous synchronous control of two cranes or two load - lifting carts.
At transfer of cranes to radio control can be used one - and 2 - speed systems:
- push - button control panels about one - and 2 - speed buttons;
- the multi - speed (from 2 to 5) lever systems with a big set of teams and functions intended for control of difficult cranes or as a part of the frequency or thyristor crane drive.
Transfer of bridge gantry cranes to management from a floor, from the remote control, is carried out with preservation of all functions of the crane, all emergency protection, the alarm system and necessary blocking.
More detailed information here:
installcraneserv. com