Currency EUR
Pump ETsV units – Plasma Company Ltd. | all.biz
Buy Pump ETsV units
Pump ETsV units
nasosnye_agregaty_tipa_ecv
nasosnye_agregaty_tipa_ecv

Pump ETsV units

In stock
Reconfirm the price with seller
Payment:
  • Cash,
  • Non-cash,
  • Cash on delivery,
  • Visa/Mastercard,
  • Western Union
  • In detail
Shipping:
  • Customer pickup,
  • Courier,
  • Transport company
  • In detail
Ukraine, Kharkov
(View map)
+380 
Display phones

Company rating

74% of positive reviews from 43
16
16 years on Allbiz
Description

Ph.: +7 (472) 277-71-72, +7 (930) 087-16-06

Pump ETsV units are intended for water supply from wells with the general mineralization (the dry rest) of no more than 1500 mg/l, with a hydrogen indicator (rn) from 6,5 to 9,5, with a temperature up to 25 °C with a mass fraction of solid mechanical impurity of 0,01% (100 gr/m3), the content of chlorides no more 350mg/l, sulfates - no more 500mg/l, hydrogen sulfide - 1,5mg/l.

Units can be used for city, industrial and agricultural water supply, for an irrigation, lowering of the level of ground waters and for domestic needs.

Units work in the long mode from a network of 3 phase alternating current of 380 V with a frequency of 50 Hz.

In designation of a standard size of the unit enter: letters ETsV (E – with the drive from the submersible electric motor, C – centrifugal, In – for water supply) and the figures which are consistently specifying: admissible diameter of an upsetting column in inches (diameter in the mm reduced by 25 times and rounded), nominal giving (in m3/h) and the pressure (in m) corresponding to nominal giving.

Case details of pumps ETsV are made of stainless steel.

ETsV with letters NRK: case details from stainless steel, driving wheels from stainless steel, a graphite thrust bearing.

The unit consists of the centrifugal pump and the submersible electric motor. The pump ETsV – one - or multistage, with vertical execution of a shaft.

Service regulations.

Installation and commissioning of electric pump units need to be carried out only attentively having studied the operation manual, delivered complete with the unit, and on the basis of the requirements stated in it.

1. Operation of electric pump units without protective, start-up - the regulating stations of management is not allowed.

2. Start of the pump unit out of a well is forbidden. Before installation of the pump unit the well has to be pumped over before water clarification (for the purpose of removal of sand, garbage, etc.).

3. The output of a well has to be more, than productivity of the installed electric pump unit.

4. At installation of the pump unit it is forbidden to weld other details on its case.

5. It is strictly forbidden to remove the backpressure valve, a drain stopper.

6. The consumer is obliged to have the act on a well within calendar year of operation of the pump.

7. Before start of the pump unit to check for isolation a conducting cable in the order specified in the operation manual.

8. Diameter of water lifting pipes has to correspond to brand of the pump unit.

9. Parameters of the pump unit (rise and a pressure) have to correspond to svezhina parameters (an output and dynamic level).

10. At operation of the pump in hydraulic systems under excessive pressure without fail it is necessary to use devices: the safety, reducing, backpressure valves, water towers and other devices protecting the pump unit from a water hammer and, as a result, from its premature exit out of operation.

Advantages of pumps of production "Azovenergomash"

Simple and reliable design;

The reinforced driving wheels;

The quantity of steps of pump part is reduced (due to improvement of hydraulics of the driving wheel and branch);

For cooling improvement, the case of the stator is manufactured of thinner metal, than before;

Due to reduction of the sizes of pump part and simplification of the case of the stator, units on average became 25-30% easier than analogs that is convenient during the transporting and installation (some units can be installed in a well "manually" without use of the truck crane);

Unit design maintainable;

There is no need to fill in the engine (PEDV) forcibly since it is executed in the self-filled execution, it is enough to install the unit in a well and in 1 hour to make trial start;

On all units besides a threaded connection, the flange for convenience of installation is established;

All complete set is made directly at our enterprise that gives the chance to realize pumps for reasonable price;

All production certified;

All production passes 100% quality control.

Price list nasosv ETsV:

Name of the ETsV model

The cost of rubles with the VAT

1.

6-4-90

22323

2.

6-4-130

24619

3.

6-4-190

28778

4.

6-6,5-60

20692

5.

6-6,5-85

22924

6.

6-6,5-100

23877

7.

6-6,5-120

25501

8.

6-6,5-140

26773

9.

6-6,5-160

28291

10.

6-6,5-180

28891

11.

6-10-50

20417

12.

6-10-80

23870

13.

6-10-110

24859

14.

6-10-140

29414

15.

6-10-185

32239

16.

6-10-235

37641

17.

6-16-50

26349

18.

6-16-75

27761

19.

6-16-90

32726

20.

6-16-110

33256

21.

6-16-140

36610

22.

6-16-160

42196

23.

6-16-180

43220

24.

6-25-70

38806

25.

6-25-100

43856

26.

8-16-80

30508

27.

8-16-80 nrk

51596

28.

8-16-100

31010

29.

8-16-100 nrk

52394

30.

8-16-140

36547

31.

8-16-140 nrk

62472

32.

8-16-160

45664

33.

8-16-160 nrk

77260

34.

8-16-180

51702

35.

8-16-180 nrk

87924

36.

8-16-250

66886

37.

8-16-250 nrk

116525

38.

8-25-70

32161

39.

8-25-70 nrk

54866

40.

8-25-100

37641

41.

8-25-100 nrk

61441

42.

8-25-125

39393

43.

8-25-125 nrk

66794

44.

8-25-145

44951

45.

8-25-145 nrk

76942

46.

8-25-180

63129

47.

8-25-180 nrk

113658

48.

8-25-235

72846

49.

8-25-235 nrk

138559

50.

8-40-45

33898

51.

8-40-45 nrk

54414

52.

8-40-60

42973

53.

8-40-60 nrk

68538

54.

8-40-90

49506

55.

8-40-90 nrk

75847

56.

8-40-120

62366

57.

8-40-120 nrk

92874

58.

8-40-150

71575

59.

8-40-150 nrk

107168

60.

8-40-180

78213

61.

8-40-180 nrk

124788

62.

8-63-50

72246

63.

8-63-50 nrk

93362

64.

8-63-70

78884

65.

8-63-70 nrk

100671

66.

8-63-90

86681

67.

8-63-90 nrk

123227

68.

8-63-110

96045

69.

8-63-110 nrk

138065

70.

10-63-40

62994

71.

10-63-40 nrk

68644

72.

10-63-65

66208

73.

10-63-65 nrk

71999

74.

10-63-110

81815

75.

10-63-110 nrk

89477

76.

10-63-150

110523

77.

10-63-150 nrk

118185

78.

10-63-180

108545

79.

10-63-180 nrk

116208

Shipping method
Payment method
Contact the seller
Pump ETsV units
Pump ETsV units
for
by the goods
Your message must contain at least 20 symbols. The message must not be more than 2000 symbols.
Obligatory field is not filled
The field is wrongly filled
The field is wrongly filled
Compare0
ClearSelected items: 0