Currency EUR
Project of felling 3-99. – ISK Konkrit Trans, OOO | all.biz
Buy Project of felling 3-99.
Project of felling 3-99.
proekt_sruba_3_99
proekt_sruba_3_99

Project of felling 3-99.

Products from producer
In stock
Price:
0.03 EUR
Shipping:
Ukraine, Chernigov
(View map)
+380 
Display phones
12
12 years on Allbiz
Description

House 2 of the floor of the manual cabin.

The house on the project No. 3-99 (S=296 sq.m, diameter of log is 22-24 cm, height of ceilings is 2,8 m) the manual cabin from high-quality Arkhangelsk belomorsky pine.

The following is included in the package of delivery:

1. Free individual design of object

2. Material for felling — log. Breed — pine. Humidity — natural

3. Pediments chopped — log planed

4. Matitsa — log planed

5. Rod posts — log planed

6. Skids — log planed

7. Coke, dowel for linking of chopped part

8. Antiseptirovaniye of bowls, grooves and walls fire-prevention structure

9. Manual okorka and ostrozhka of the wood plane or drawing knife to "whiteness"

10. Marking of the house and mapping of assembly

11. Packing in packages (pallets) according to type of transport from the used elastic packaging tape

All other component parts (draft floors, finished floors, boards on rafter system, material of roof, window, door and so forth) are bought by you in addition. All these materials you will be able to get on site constructions, what will be more economic, as transportation costs are excluded.

The cost of delivery of set from Arkhangelsk to site of the Customer (It is necessary to specify).

Shipment at own expense from Arkhangelsk your transport is possible.

We can offer service in mounting of felling on your ready base.

Mounting includes the following works:

1. Works on assembly of felling.

2. Draft finishing (draft floor, draft ceiling, mounting of rafter system, the roof device without roof).

The specification of draft materials is provided in the Project which will be sent you after its payment.

On the arrival of crew, you need to provide power supply, water supply and the place for accommodation on site of building (change house). By the time of arrival of set of the house, the base has to be ready.

The term of production of the house in the way of the manual cabin will approximately make 1,5 — 2 months.

Mounting of the house on the ready base of 3-5 weeks.

Finishing work, mounting of windows, doors and finishing roofing works are performed through the shrinkage period.

At this stage we recommend to consider option of construction of the main part of the house. It is the base, felling and its mounting.

Shipping method
Contact the seller
Project of felling 3-99.
Project of felling 3-99.
for
by the goods
Your message must contain at least 20 symbols. The message must not be more than 2000 symbols.
Obligatory field is not filled
The field is wrongly filled
The field is wrongly filled
Compare0
ClearSelected items: 0