Currency EUR
Installation for processing transformer, turbine, the UVM 10-10 industrial oil – NPP Vektor, OOO | all.biz
Buy Installation for processing transformer, turbine, the UVM 10-10 industrial oil
Installation for processing transformer, turbine, the UVM 10-10 industrial oil

Installation for processing transformer, turbine, the UVM 10-10 industrial oil

In stock
Reconfirm the price with seller
Shipping:
Seller
Russia, Saratov
(View map)
+7(8 
Display phones

Company rating

100% of positive reviews from 4
Description
Installation for processing transformer, turbine, the UVM 10-10 industrial oil

Installation for processing of the UVM 10-10 transformer oil, is intended for decontamination, cleaning of mechanical impurity, nitriding and heating of the transformer oil which is filled in in power transformers up to 1150 kV inclusive.

Installation can be used for heating of oil-filled electric devices by hot transformer oil, and also for pumping out of power transformers.

Installation is applied in the assembly, repair and operational organizations which are engaged in processing of transformer oil.

Installation is executed in the form of the container with the protection cover and doors closed on the lock.

Installation is made in a climatic modification of U1 in accordance with GOST 15150.

Installation is not suitable for work in the explosive, poisoning, reacting with lubricants Wednesdays.

At application of installation in the enclosed space it is necessary to provide removal of the pumped-out gases in the atmosphere by means of pipelines.

Technical characteristics of installation

Parameter Value
Productivity, m3/hour, no more
- in the decontamination mode 10
- in the heating mode 15
Parameters of the processed oil:
- volume gas content of oil of %, no more 0,1
- mass moisture content of oil, g/t, no more 10
- subtlety of a filtration, micron, no more 10
The maximum temperature of oil at the exit in the heating mode, ºС 85
Pressure at the exit, MPa 0,2
Power of a maslonagrevatel, kW 150
Maximum power consumption, kW 185
Residual pressure in a vacuum column in the course of decontamination, Pa, no more 399
Residual pressure in a vacuum column when checking on tightness, Pa, no more 39,9
Natekaniye when checking on a vakuumplotnost in 1 hour, Pa no more: 266
Parameters of electric current
- tension, In 220/380
- variable with a frequency, Hz 50
Overall dimensions, mm no more
- length 3500
- height 2250
- width 2250
Weight, kg, no more 3800
Contact the seller
Installation for processing transformer, turbine, the UVM 10-10 industrial oil
Installation for processing transformer, turbine, the UVM 10-10 industrial oil
Shipping method
Compare0
ClearSelected items: 0