Currency EUR
IGV 220/2 hydrofunnel – TD ISOT PLYuS, OOO | all.biz
Buy IGV 220/2 hydrofunnel
IGV 220/2 hydrofunnel

IGV 220/2 hydrofunnel

Products from producer
In stock
Reconfirm the price with seller
Shipping:
Seller
Russia, Ijevsk
(View map)
+7(9 
Display phones
Technical characteristics
  • Mass195 kg
  • Производительность по раствору150 -250 куб. м /час
  • Производительность по сыпучим компонентам-12- 18 т/час
  • Давление нагнетания жидкости3,5 кг/ см2
  • Длина1270 мм
  • Ширина730 мм
  • Высота1095 мм
Description

Purpose of the Product

The hydrofunnel of IGV 220/2 is intended for preparation, processing, weighting and preliminary dispergating of boring solutions on a water basis and hydrocarbonic emulsions by mixing of powdery materials with liquid

Installation of a product

1. It is necessary to establish a hydrofunnel on a flat horizontal surface and to fix strongly on it on adjusting openings. 2. To connect the giving pipe of the 2nd pressure head line to the delivery line of the feeding centrifugal pump by means of a collar Viktaulik 6". 3. To connect a discharge pipe of the 3rd pressure head line with in the taking-away pipeline. By means of a collar Viktaulik 6". The ATTENTION - for the most effective work of a hydrofunnel needs to be provided And) the Minimum quantity of knees and hydraulic resistance both on bringing, and on the taking-away line. B) Diameter of pipelines was NOT LESS THAN diameter of the pressure head line - in our case not less Du - 150 mm. C) The minimum distance from a discharge pipe to the first bend of the taking-away pipeline has to be not less than 6 (SIX) diameters of the taking-away line. 4 Before installation of consolidations rubber VIKTAULIK them needs to be greased with an aerosol. WD 5. The hydrofunnel is calculated on work in the mode of a continuous 5th stream. It means that any obstacle to a current even down from a funnel, significantly reduces efficiency of an eductor 5 WORK of the PRODUCT of Gidrovoronk of IGV 220/2 are a device - the diffuser, working by the principle of the law of Bernoulli "The stream speed is higher, the pressure is lower, and, on the contrary, the stream speed is lower, the pressure" in the course of work of a hydrofunnel for creation of a high-speed stream and pressure of liquid is higher the centrifugal pump is used. 1. Before work be convinced that the taking-away pipeline from a hydrofunnel has no the closed latches. 2. Close ALL soaking-up valves on a hydrofunnel (the gate 4" on rice 1 and 1 and), and also the sharovy crane 2 lines of powering of a premikser. (rice No. 3) 3. Be convinced of reliability and tightness of all connections. 4. Start the centrifugal pump for creation of pressure in a hydrofunnel, following at the same time procedures for safety measures 5. To use function of self-cleaning of a hydrofunnel, it is necessary to open gradually the sharovy crane 2 lines of powering of a premikser to 100%, and in this mode to allow to work to a hydrofunnel within 15 minutes. In this case the additional high-speed stream will clear a chamber of mixing of the ejector. 6 After completion of procedure of cleaning of a chamber CLOSE the SHAROVY CRANE 2 lines of powering of a premikser. 7. On achievement of vacuum of 558 - 737 mm Hg (0,75-1 kg / kv.sm) open the gate 4 "under the bunker 2 (rice 4). (Decrease in vacuum to 0 mm Hg is CONSIDERED NORMA). Attention: Never you bring hands to an entrance opening of the bunker. Force of absorption is very high. 8. Open the gate 4", located under the bunker and glance in an opening. Adjust a stream of a premikser so that there the strong whirlpool was formed. 9. The radial premikser has to be used ALWAYS if loading of chemical reagents is conducted via the bunker. 10. The radial premikser has to be ALWAYS CLOSED if he is not used. 11. In case chemical reagents move through Lateral input (rice 1a), but not via the bunker, then use the above described procedure of self-cleaning of a hydrofunnel (point 5), without having forgotten to close at the same time the sharovy crane 2 lines of powering of a premikser before opening of the gate 4" lateral input (rice 1a) 12. During the work through Lateral input (rice 1a) from a large-capacity container the valve of the giving line from a large-capacity container, and only then the gate 4" lateral input opens in the beginning. At the same time the vacuum will vary from 0 to 737 mm Hg (0 - 1 kg / kv.sm) On completion of work at first to close the valve of the giving line from a large-capacity container, and only then to close the gate 4" lateral input. 13. ATTENTION. Viscosity excess will lead more than 750 joint ventures to considerable decrease to absorption of a stream. It is impossible to give material forcibly at all. It has to be sucked in by the hydrofunnel. 14. In case of a stop of work of a hydrofunnel AT FIRST it is necessary to block the soaking-up hydrofunnel valve (i.e. to close a lock on the hydrofunnel binding pipeline before the giving pipe of the 2nd pressure head line) to a full stop of the pump. It will allow to prevent formation of the return stream in the bunker (or to the line of a lateral supply)
Contact the seller
IGV 220/2 hydrofunnel
IGV 220/2 hydrofunnel
Shipping method
Compare0
ClearSelected items: 0