Currency EUR
Factory Sale – Tehnologii Kapitalnogo Stroitelstva, OOO | all.biz
Buy Factory Sale
Factory Sale
gotovyj_biznes_zavod
gotovyj_biznes_zavod
gotovyj_biznes_zavod
gotovyj_biznes_zavod

Factory Sale

Products from producer
In stock
Reconfirm the price with seller
Payment:
  • Cash,
  • Invoice payment,
  • Cash on delivery
  • In detail
Shipping:
Seller
Russia, Habarovsk
(View map)
+7(9 
Display phones
Technical characteristics
  • BrandЭМЗ
  • Country of manufactureRussia
Description

 

COMMERCIAL INFORMATION GK "EMZ"

 

1. The plant is located at the address: Khabarovsk, 60 - letiya Oktyabrya avenue, 5 (Southern industrial center), on a land plot with an area of 30730 m2 (3.1 ha - property).

2. On the territory of the plant there is a workshop for the production of concrete products with an area of 5500m2 (property), two spans 24x116m, equipped with 3 bridge cranes 15tn. , 1 bridge crane 20tn + 5tn. workshop height 10m. Inside the workshop there is equipment for processing reinforcement, rolled metal, there are hardening chambers (steaming), office, warehouse, and household premises. The production of reinforced concrete structures for road, oil and gas and industrial construction has been established, with the production of 1000 - 1500 m3 of prefabricated reinforced concrete per month.

3. A workshop for metalworking and metal structures with an area of 3200m2 (property), inside the workshop there is a bridge crane 10tn, a bridge crane 5tn, the height of the main workshop is 10m. , A beam crane 3tn - 3pcs, metalworking machines - 8pcs, a forge shop, household premises, changing rooms, showers, ABK building 220m2 (6 offices + dining room). The production of metal structures of any complexity has been established, with an output of 150 - 200 tons. metal structures.

4. ABK building - 4 floors of 700m2, with a total area of 2800m2 (property (renovation needed)

5. Detached building - 2 floors, 270m2 each.

6. Warehouse with dimensions 28x56m, height 10m, dismantled.

7. Open area 40x250m. with a crane runway 32 m track, for the installation of 2 gantry cranes.

8. There is a bomb shelter with an area of approx. = 3000m2.

9. Availability of metal molds for the production of reinforced concrete products - 126 units, according to the list.

10. Availability of access roads and railways (property of PPZhT), the possibility of loading and unloading gondola cars.

11. There is a concrete ramp for loading and unloading equipment from platforms, the standard for setting is 2 cars.

12. Electricity 520 kW, 2 transformers of 630 kVA, steam, technical conditions, water, etc.

The plant is fully operational.

Website: emz 27. com

 

Contact the seller
Factory Sale
Factory Sale
Shipping method
Payment method
Compare0
ClearSelected items: 0