其他企业物品
技术特点
- 牌子mzgg
- 生产国中国
- 电压high voltage 10-500k V
描述
Electric Power Transmission Line Steel Tower :
1. Price Term: EXW, FOB, CFR or CIF.
3. Performance Standard
Besides conforms to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards) and customer's requirements.
4. Steel pipe tower welded requirements
1 )we used CO2 welding and submerged arc auto welding or other methods as AWS D1.1
2 )Welded seam shall be full penetration and grinded.
3 )The welded product has no fissure, scar, overlap, layer or other defects.
5. Steel tower Galvanization
All steel items, bolts, nuts, washers & other components to be hot -DIP galvanized with uniform. As per (ASTM-A-123).
5. MOQ: One 40FT Container.
6. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
7.Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.
8. Package: Normally wrapped by plastical bags ,mat or burlap cloth at the top and bottom,or according to clients requirement.
1. Price Term: EXW, FOB, CFR or CIF.
- The price include pole shaft, base plate, crossarm ,anti-climbing device, fasten parts and anchor bolt.
- Shipping seaport: Qingdao Seaport.
- Please provide drawings if you have so that we can calculate the accurate price for you.
- We also provide design according to your requests, if you don't have drawings.
3. Performance Standard
Besides conforms to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese Standards) and customer's requirements.
4. Steel pipe tower welded requirements
1 )we used CO2 welding and submerged arc auto welding or other methods as AWS D1.1
2 )Welded seam shall be full penetration and grinded.
3 )The welded product has no fissure, scar, overlap, layer or other defects.
5. Steel tower Galvanization
All steel items, bolts, nuts, washers & other components to be hot -DIP galvanized with uniform. As per (ASTM-A-123).
5. MOQ: One 40FT Container.
6. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
7.Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.
8. Package: Normally wrapped by plastical bags ,mat or burlap cloth at the top and bottom,or according to clients requirement.
联系卖家
Substation Steel Structure
我们建议看